Archive for September 17th, 2009

Ribbon Cutting Ceremony Sept. 18 for Dearborn High School’s New $2.9 Million Athletic Facility

Thursday, September 17th, 2009

Dearborn High School will hold a ribbon cutting ceremony this Friday at 6:30 p.m. for the school’s $2.9 million athletic complex renovation. The ceremony will take place on the school’s new synthetic turf football field prior to the start of the Sept. 18 football matchup with cross town rival Fordson High School.

Dearborn High School will celebrate new football field and athletic complex this Friday, Sept. 18. This earlier photograph shows the new synthetic turf being installed.

Dearborn High School will celebrate its new football field and athletic complex this Friday, Sept. 18. This earlier photograph shows the synthetic turf being installed.

As a Dearborn High graduate, I’m still having a hard time adjusting to the relocation of the football field from the valley to alongside busy Outer Drive. Don’t get me wrong, the field looks great and so do the new stands. It’s just the wrong place for a football field and the home seats are actually constructed on the wrong side of the new stadium (the sun is supposed to shine in the faces of the visiting team, not the home team sideline). In addition, noise complaints from nearby residents have forced the school to turn down the volume of the loudspeakers at the new football field.

We can’t help but wonder what the field would have looked like if the School Board had taken up the City of Dearborn’s offer to pay for the costs of moving clay and dirt from the holes being dug for the combined sewer overflow basins and used it to raise the grass field in the valley.

A Dearborn Schools spokesman confirms the city did indeed make such an offer but it wasn’t as simple as filling the valley up with dirt to raise the field out of the flood plain. The quality of the soil that would have been trucked from holes along the Rouge River to the school was unknown and would have needed testing. In addition, the school district would have had to create a new flood plain in another location to match the exact size of whatever was changed in the valley of Dearborn High. While an interesting idea, those obstacles stopped the plan before it could ever get traction.

For those wondering, the $2.9 million price tag at Dearborn High covered the complete renovation of all athletic property at the school. The athletic complex renovation project began with the west complex in the spring of 2008. The complex includes a new synthetic turf football field, grandstands, press box, concession stand, new tennis courts, new softball field, renovated baseball field and renovated track.

The Dearborn High project is the final piece of a three year district-wide program to renovate the athletic facilities at all three high schools. A great deal of work was accomplished at Dearborn High over the summer. The school held their first gridiron match-up on their new synthetic turf field on Sept. 4, 2009.